Current /Completed Projects by CMC

Bedford Township Offices/Fire Station

Contract Type: Construction Management

Architectural Services: James Schuemann Architect

Completion September 2001

This project replaced the existing facility built in 1939. Aproximately 8,000 square feet divided equally between the new Township Offices and the drive thru Apparatus Bays.

 

Heritage Chevrolet Used Car Facility

Contract Type: Design/Bid/Build

Architectural Services: Howard Overbeek

Completion January 2002

This project was fast tracked using a clear span Varco-Pruden Building (VP). The existing facilty remained until the new facility was ready to occupy. Total project duration of nine weeks allowed for limited interuption of services.

Maple Lawn Medical Care Facility

Contract Type: Construction Management

Architectural Services: Eckert-Wordell Architects

Completion June 2002

This project consist of 12,000 square foot expansions, and renovations of a existing facility. A Master Plan was created to update the facility, and change the social enviroment to meet Residents ever changing needs.

 

Lenawee Medical Care Facility


Contract Type: Construction Management

Architectural Services: Eckert-Wordell Architects

Completion May 2003

This project consist of 24,000 square foot expansions, and renovations of a existing facility. A new resident wing was created to provide private beds as a replacment of four bed wards. Three two story Solarium Additions provide an Eden Alternative enviroment with socialization and dining in the newly created neighborhoods.


Norman Food Facility

Contract Type: Design-Build

Engineering Services: Rodney J. Bronson, P.E.

Completion December 2002

This project stablilzed the exterior structure of a 1926 facility. The structural steel was installed on the interior and exterior of the front of the structure. A Exterior Insulation Finish System was used to cover the exposed structural steel, bringing new life into a old structure.

 

Pine Meadow Farms

Contract Type: Design-Build

Architectural Services: James Schuemann

Completion November 2002

This project consist of sixteen horse stall additions to the main barn, and renovations to the existing facility.

 

Dowling Monument & Markers

Contract Type : Design Build

Completed 2004

Architectural Services: James Schumann

2560 square feet Pre-Engineered building.

CITGO Gas Station

Contract Type: Design-Build

Completed 2003

Architectural Services: Frank Mason & Associates

New 2400 square feet Pre-Engineered building.